Instaquipt · plan builder review · Wednesday 18 November 2026

Your day with the plan builder

Thanks for coming in. Our plan builder draws traffic guidance schemes on real Adelaide streets with no AI in the drawing. It follows SA Standard for Workzone TM v8, the DIT Supplement, AS 1742.3 and AGTTM. It is good on low-speed council work and still learning fast roads, traffic lights, lateral shifts and contraflows. Today you are the one it learns from.

Everything you send arrives straight away. We read it during the day and our replies show at the bottom of this page.

Work through the parts in order, but take breaks when you like. Send part-way and often: nothing is lost if you come back later on the same device.
9:15
about 2½ hrs

Part 1: where would you put the signs?

Eight real sites with no plan drawn: traffic lights, a divided road, hills roads, a freeway and night works. Draw your set-up. After you send each one, the builder's plan for that site opens and you tell us whose set-up is right.

Start Part 1
12:30
about 2½ hrs

Part 2: mark the builder's plans

Fast-road plans the builder drew at 60 to 110 km/h. Pass, small fix or fail, with marks on the plan.

Start Part 2
3:00
about 1½ hrs

Part 3: show us how

Two lateral shifts and two contraflows on real roads. The builder can't draw these yet, so your drawing is what it learns from.

Start Part 3
4:30
about 30 min

Part 4: your own plans, and seven questions

Send us two or three of your own TGSs. We check them against the SA rules and reply here with anything we'd change. Then answer the seven rule questions below.

Go to Part 4

Part 4a: send one of your plans

A PDF, a screenshot or a phone photo of a real TGS you drew, or of a good set-up on site. One plan at a time. Tell us what it is.

Part 4b: seven rule questions

These are the rule questions the builder is stuck on. Short answers are fine. Say which standard or clause if you know it.

  1. Busy two-lane rural road. Heaslip Rd, Angle Vale, 90 km/h, about 1,000 vehicles an hour. One lane has to close. Above 800 an hour, AGTTM Part 3 Table 5.4 gives no shuttle length. What should the builder do: portable lights, night works, a DIT risk assessment, or something else?

  2. Peak hour. When we only have daily traffic (AADT), the builder takes 10% of it as the peak hour. SA Std v8 Appendix B accepts AADT ÷ 11. Which should we use?

  3. Sign spacing on 80+ km/h shuttles. House rule A141 caps sign spacing at 3 × D. AGTTM Part 3 Table 4.4 asks for 4 × V at design speed. Which wins in SA?

  4. END ROAD WORK speed. Where the posted limit changes inside the zone, we show the limit that applies at the END sign's own spot. Right?

  5. Footpath jobs. We read a TC's mark as "no signs on side streets that join outside the advance signs, but side streets inside the zone still get signs". Right?

  6. Divided 110 km/h highway, left lane closed (Sturt Hwy, Gawler Belt). Where should the TCV with the arrow board sit?

  7. Anything else the builder should know about fast roads or traffic lights in SA?

Our replies to your work

Updates every minute. Newest first.

Nothing yet. Replies show here once you've sent something.