← Back to the day plan
Part 1: where would you put the signs?
Eight real sites, no plan drawn. For each one, draw your set-up on the map: signs, cones, TCs and TCVs, as you would on a real TGS. Pick the set-up and write your sign list with distances. The blue dots on each map are every 50 m along the road from the work.
Press Send after each site or two. Once a site is sent, the builder's own plan for it opens underneath. Tell us whose set-up is right and why, then send again.
1
Magill Road, Trinity Gardens
60 km/h · TMD-01
The job: Water main valve repair in the kerb-side lane, just past the Portrush Rd traffic lights.
Draw it: place every sign, cone line, TC and TCV for both directions, as you would on a real TGS. Then pick the set-up and write your sign list with distances.
No marks yet.
Which set-up would you use?
Now compare: the builder's plan for this site
The builder's own checks marked this NOT READY: Merge taper runs across a side-street or driveway entrance (house rule A126); Speed signs at zone start, duplicated; repeaters for road users entering; max 500 m (AG3 s5.5.1.3); Work in (part of) a traffic lane needs a cone line / taper / lane closure, not "working clear" (AS s4.2.3). Tell us what you would change.

Tap the plan to open it full size.
Read the signs: every sign close up (22)
Whose set-up is right?
2
Unley Road, Unley
60 km/h · TMD-02
The job: Stormwater pit repair in the kerb-side lane near the Greenhill Rd traffic lights.
Draw it: place every sign, cone line, TC and TCV for both directions, as you would on a real TGS. Then pick the set-up and write your sign list with distances.
No marks yet.
Which set-up would you use?
Now compare: the builder's plan for this site
The builder's own checks marked this NOT READY: Work in (part of) a traffic lane needs a cone line / taper / lane closure, not "working clear" (AS s4.2.3); Merge taper runs across a side-street or driveway entrance (house rule A126). Tell us what you would change.

Tap the plan to open it full size.
Read the signs: every sign close up (16)
Whose set-up is right?
3
Main North Road, Elizabeth
80 km/h · TMD-03
The job: Median barrier repair in the right (median-side) lane of a divided road.
Draw it: place every sign, cone line, TC and TCV for both directions, as you would on a real TGS. Then pick the set-up and write your sign list with distances.
No marks yet.
Which set-up would you use?
Now compare: the builder's plan for this site
The builder's own checks marked this NOT READY: Speed signs at zone start, duplicated; repeaters for road users entering; max 500 m (AG3 s5.5.1.3). Tell us what you would change.

Tap the plan to open it full size.
Read the signs: every sign close up (14)
Whose set-up is right?
4
Gorge Road, Cudlee Creek
80 km/h · TMD-04
The job: Rock wall repair taking one lane of a winding two-lane hills road.
Draw it: place every sign, cone line, TC and TCV for both directions, as you would on a real TGS. Then pick the set-up and write your sign list with distances.
No marks yet.
Which set-up would you use?
Now compare: the builder's plan for this site
The builder's own checks marked this NOT READY: No duplicate frames (same message, same approach, within 10 m); car parks, driveways, private tracks and service lanes are not side roads (AG3 s3.7); ROADWORK AHEAD before the primary PREPARE TO STOP at Table 4.4 spacing (AG3 s4.8 step 10 Table 4.4); Side-road frames: mirrored pair, speed roadside on both faces (LOG rule 0s); Work in (part of) a traffic lane needs a cone line / taper / lane closure, not "working clear" (AS s4.2.3). Tell us what you would change.

Tap the plan to open it full size.
Read the signs: every sign close up (25)
Whose set-up is right?
5
South Eastern Freeway, Monarto
110 km/h · TMD-05
The job: Fence repair working from the left shoulder of the freeway.
Draw it: place every sign, cone line, TC and TCV for both directions, as you would on a real TGS. Then pick the set-up and write your sign list with distances.
No marks yet.
Which set-up would you use?
Now compare: the builder's plan for this site
The builder's own checks marked this NOT READY: Temporary speed zone lengths (40: 100-500 m; 60 buffer 100 m min; 80 buffer 300 m min) (AG3 s5.5.1 Table 5.5). Tell us what you would change.

Tap the plan to open it full size.
Read the signs: every sign close up (8)
Whose set-up is right?
6
Montague Road, Ingle Farm
70 km/h · TMD-06
The job: Footpath crossover rebuild taking the kerb-side lane.
Draw it: place every sign, cone line, TC and TCV for both directions, as you would on a real TGS. Then pick the set-up and write your sign list with distances.
No marks yet.
Which set-up would you use?
Now compare: the builder's plan for this site
The builder's own checks marked this NOT READY: Temporary pedestrian crossing: not on a divided / multilane 60+ road without control (TC stop/slow or signals); never inside a merge taper or the TCV / work zone (AG3 s3.10.1); Signs on the footpath/verge, never in a lane (LOG rule 0a); Every junction leg inside the signed zone is signed (AS s4.2.1); TC position: clear escape path, not in live traffic, intersection, median or driveway (SA8 s5.5.1). Tell us what you would change.

Tap the plan to open it full size.
Read the signs: every sign close up (16)
Whose set-up is right?
7
Port Road, Hindmarsh
60 km/h · TMD-07 · NIGHT
The job: Road resurfacing in the kerb-side lane at NIGHT (8pm-5am).
Draw it: place every sign, cone line, TC and TCV for both directions, as you would on a real TGS. Then pick the set-up and write your sign list with distances.
No marks yet.
Which set-up would you use?
Now compare: the builder's plan for this site
The builder's own checks marked this NOT READY: X-PED-CYC; TC position: clear escape path, not in live traffic, intersection, median or driveway (SA8 s5.5.1); TCV must not stand in a live lane of another carriageway / road, a driveway or a roundabout (AG7 s2.7.3 item 10). Tell us what you would change.

Tap the plan to open it full size.
Read the signs: every sign close up (8)
Whose set-up is right?
8
Main South Road, Yankalilla
100 km/h · TMD-08
The job: Culvert extension taking one lane of a rural two-lane highway.
Draw it: place every sign, cone line, TC and TCV for both directions, as you would on a real TGS. Then pick the set-up and write your sign list with distances.
No marks yet.
Which set-up would you use?
Now compare: the builder's plan for this site
The builder's own checks marked this NOT READY: No duplicate frames (same message, same approach, within 10 m); car parks, driveways, private tracks and service lanes are not side roads (AG3 s3.7); Speed zone lengths per AGTTM Table 5.5; longer must be highlighted (SA8 s7.1.4 Table 7.3). Tell us what you would change.

Tap the plan to open it full size.
Read the signs: every sign close up (26)
Whose set-up is right?
Anything else?
0 of 8 done